Presite Work: The pre-site portion of the building process takes place in five parts.
On-Site Work: The actual building begins, going through several key stages.
| Foundation Stage |
The first step in the building process is laying a foundation - the structure the house is built on. This involves: Excavation - The building hole is excavated so the cribbing can be placed for the foundation. Cribbing and Concrete Work - Wooden forms to pour the foundation into are created.
|
|---|---|
| Framing Stage |
Framing - The basic timber structure of the house is built, including floor joists; roofs; walls; ceilings and beams.
|
| Rough-In | Rough-In - Heating, electrical and plumbing rough-ins are completed. This includes water lines; lighting; central vacuum; television cable; telephone lines; fireplace; furnace and exhaust fan rough-ins. |
| Flat Concrete |
|
| Roofing | Roof shingles are installed. |
| Exterior Finishing |
|
| Interior Finish | Insulation and drywall - Fiberglass batt insulation is installed on exterior and interior walls and the roof. The walls are then covered with half-inch drywall and metal corners. Drywall is screwed, taped and sanded. The ceiling is textured. |
| Painting | First stage - Walls are primed. |
| Finishing | First Stage - Casing is installed around windows and doors.
|
| Cabinets and Countertops | Installation - Cabinets and countertops are installed in the bathrooms and kitchen. |
| Drywall Touchup |
|
| Flooring | Installation - Carpet and linoleum or tile are installed. |
| Painting and Finishing | Second stage - Two coats of paint are applied to the walls.
|
| Final Touches |
|
| Grading | Rough grading of the front and back yards, using loam from the area developer. |
| Parging | The parging, a coat of cement mortar applied to the exposed portion of concrete walls, such as basement walls, is completed. |